Mycopath Recovery Support the research on GoFundMe.

Montana · LEARNING DIRECTORY

Silver Bow Creek / Butte Area

Butte and surrounding watershed. An official-source reading entry, not a Mycopath project or current safety advisory.

Back to all 50 places

Official-source summary last reviewed 2026-09-27. Cleanup information may have changed. Check the linked agency page for current status, access rules and advisories.

Documented issue

Historic mining left tailings along Silver Bow Creek, contaminated soils and polluted water in flooded mine workings, including the Berkeley Pit.

Why attention matters

Cleanup involves different pathways across a large watershed. Restored stream sections still need monitoring, while other mine and soil areas require continuing work.

Official cleanup context

EPA and Montana DEQ oversee separate cleanup areas, with stream restoration, soil investigations, water management and ongoing environmental monitoring.

EPA: Silver Bow Creek / Butte Area current site status

Historical summary: 2026-09-27. This describes other organizations' work, not Mycopath accomplishments.

Unanswered question

How can long-term measurements show whether restored vegetation and stream habitat remain healthy after mine-waste controls are installed?

Qualified site-specific evaluation, permission and applicable approvals would be needed before any proposed work. Do not enter, sample or handle hazardous materials based on this directory.

Share public knowledge or technical context