Mycopath Recovery Support the research on GoFundMe.

New York · LEARNING DIRECTORY

Gowanus Canal

Brooklyn. An official-source reading entry, not a Mycopath project or current safety advisory.

Back to all 50 places

Official-source summary last reviewed 2026-09-27. Cleanup information may have changed. Check the linked agency page for current status, access rules and advisories.

Documented issue

Industrial discharges and combined-sewer overflows left canal sediment contaminated with PAHs, PCBs and metals.

Why attention matters

Cleaning sediment without controlling incoming pollution can compromise recovery. Both historic waste and continuing sources require attention.

Official cleanup context

EPA’s remedy combines dredging, stabilization, capping and source controls. Most upper-canal work finished in 2024; middle-section design was finalized in 2025.

EPA: Gowanus Canal cleanup activities

Historical summary: 2026-09-27. This describes other organizations' work, not Mycopath accomplishments.

Unanswered question

What could source-control and post-cleanup monitoring teach us about designing complementary natural treatment research?

Qualified site-specific evaluation, permission and applicable approvals would be needed before any proposed work. Do not enter, sample or handle hazardous materials based on this directory.

Share public knowledge or technical context